Explore civil software like AutoCAD, Revit, ETABS, and STADPRO to plan, model, analyze, and produce structural drawings, 3D views, and PDF releases for site execution.
Explore building types by usage: residential, apartments, commercial, industrial, infrastructure, and compare load bearing, frame, and flat slab structural systems along their load paths, including drop panels and punching shear.
Explore frame and flat slab structural systems, grid and waffle slabs, drop panels, and pre-tensioning and post-tensioning, plus prefabricated and pre-engineered buildings for faster, column-free spaces.
Explore the NBC-based building classifications and the three project stages—pre-construction, construction, and post-construction—covering concept definition, planning, budgeting, commissioning, handover, and post-occupancy evaluations.
Revise key concepts through a quiz on etabs staad.pro, building systems (load bearing and frame structures), stages of a construction project (pre, during, post), NBC, and alluvium vs conventional formwork.
Master the site engineer's responsibilities: execution, supervision, reading drawings, planning, DPR reporting, material management, and multidisciplinary coordination to deliver quality, safe, on-schedule construction.
Understand how cement binds concrete through C3S and C2S hydration to form calcium silicate hydrate gels, and why RCC uses steel reinforcement for ductile failure.
Explain why concrete resists compression and steel resists tension, with bottom-positioned rebar to control cracks, and why steel–concrete pairing hinges on similar coefficient of thermal expansion and good bonding.
Examine cement grades (33, 43, 53) and ordinary portland cement, then analyze concrete grades from m7.5 to m50, PCC use, ratios, and category distinctions per 456-2000.
Learn about rebar grades, including Fe 500 and 550 for ductility in seismic zones, understand tmt bars, lugs, ribs, and common diameters up to 40 for steel sizing.
Compare nominal and design concrete mixes, explain volumetric batching, fixed M20 ratio 1:1.5:3, and emphasize testing of cement, sand, and aggregates per IS 10262 2019.
Explain nominal vs design mix for concrete, covering volumetric batching, material quality control, and testing, and how design mix uses ratios and admixtures to meet target strength.
Explore is 10262-2019 concrete mix design for m40, covering water–cement ratio, aggregates, air content, and admixtures, plus batching plant guidance from is 4926 and transit mixer practices.
Discover how soil testing governs foundation stability and bearing capacity, guiding cost optimization and excavation decisions, including standard penetration tests with a split spoon sampler and a drop-hammer procedure.
Explore the standard penetration test using a split spoon, generating n values to assess soil bearing capacity. Learn to read geotechnical soil reports and borehole layouts for industrial projects.
Site clearance removes debris, trees, and existing structures, then levels the land, and site mobilization sets up offices, labor huts, utilities, equipment, and material storage to commence construction.
Take a quick quiz on rebar diameters, unit weight and area, nominal vs design mix, cement and concrete grades, codebooks for mix design and batching, soil reports, and TMT bars.
Set up a temporary benchmark (TBM) on the construction site as a fixed elevation reference, with TBMs at multiple corners for accessibility, using the permanent benchmark and total station readings.
Discover centerline marking for footing layouts using the 3-4-5 method, read drawings, and apply working space concepts to plan site operations and access.
Demonstrate centerline marking on a plot boundary using stones and nylon line, ensuring a 90-degree layout. Use the 3-4-5 method to verify diagonals and set footing offsets from the center.
Execute center line marking on site by establishing boundary references, placing four stones, tying a center line, and verifying right angle and measurements with the 3-4-5 method.
Practice four assignments to master center line marking, footing layout, and north-aligned grid planning for a 40 by 60 plot, including 3-4-5 checks and working-space considerations.
Learn center line marking for a large apartment project, including grid lines, overlapping footings, and practical marking methods with total stations. Emphasize safety and proper line-holding technique on site.
Demonstrate how total station marks centerlines and footings on site, converting AutoCAD coordinates to northing and easting with a prism, and compare with manual marking using grid lines.
Apply total station marking to transfer grid points into site coordinates, set up the instrument on a tripod, and project northing and easting for centerline marking.
Master the practical AutoCAD workflow to prepare column centerline drawings by aligning lines through column centers with construction lines, setting grid marks, and dimensioning footing and column layouts.
Learn soil excavation methods for construction sites, including earth and rock excavation, dewatering, lime-sand stabilization, and footing planning based on soil reports and hard strata.
Explain shoring methods to protect soil and workers during excavation, covering sheet pile, soldier pile with lagging, hydraulic and pneumatic shoring, beam and plate systems, and trench boxes.
Explore secant and tangent piles, sheet piles, and shoring for deep excavation. Learn how primary piles in soft soils interlock with reinforced secondary piles to form a stable wall.
Plan and execute soil preparation for PCC by dressing footing, avoiding over-excavation, and using plate compactor and monkey rammer, while storing soil on site to manage space constraints.
Explore how to use a site checklist, prepare a bill of quantities (BOQ), and estimate excavation works with footing calculations, safety measures, and rate analysis.
Verify the architectural drawing, measure plot dimensions, and check footing markings with proper working space, then plan excavations under space constraints while ensuring safety, shoring integrity, and quality standards.
Explore PCC laying as a lean blanket for footings, 75–100 mm thick with M7.5 or M10 grade and 40 mm aggregate; note sand and boulder layers when soil is weak.
Learn how PCC offset creates space under footings for a shuttering surface, with 50–75 mm offsets and a 75 mm PCC thickness, plus grid line marking and surveyor end points.
This lecture covers the PCC checklist, BOQ, and estimation of plain cement concrete, including a practical footing quantity calculation and checks for formwork, compaction, and curing.
Explore practical excavation and PCC execution with benching, space planning, dewatering, and safe concrete pouring techniques. Learn measurement methods, material handling, and curing practices from real site videos.
Mark column positions on PCC by transferring grid lines with nylon string and plumb bob, read column drawings for C5 and C9 sizes nine by twelve and nine by fifteen.
Learn practical column layout marking on a construction site by tying grid lines, using plumb bobs, and applying 3-4-5 and diagonal checks to ensure accurate footing and column placement.
Demonstrates the 345 method for column diagonal marking and checking, using center-to-center distances and the diagonal calculated by the pythagorean formula, with 90-degree checks and on-site adjustments.
Learn how to mark columns with a total station using four-point marks, cross verification with grid lines and AutoCAD data, and ensure 40 mm cover and accurate outer dimensions.
Learn practical column marking with a line marker and total station, covering traditional, medium-size, and large-company methods, safety gear, and how markings align footings and grids.
Learn to place footing mesh and column reinforcement with accurate bar bending schedules, cover blocks, and footing drawings to ensure load distribution, stability, and durability in concrete foundations.
Learn to read footing drawings and prepare a bar bending schedule for RCC footings, including calculating cutting lengths, bar counts, and steel weight from a practical F1 footing example.
Learn how foundation formwork shapes and supports poured concrete using shuttering and centering, materials like plywood and steel, and design and on-site checks for alignment and curing.
Review the shuttering and reinforcement checks before, during, and after concreting, ensuring design conformity, gap sealing, proper oiling, accurate inner dimensions, then verify reinforcement drawings, bending schedule, and curing timing.
Learn the pre concreting checklist—cleanliness, formwork, reinforcement readiness, expansion joints, access platforms, and concrete sequencing for mass or raft work—plus ensure continuous flow, vibration, and tarpaulin protection.
Verify concrete orders on site as a site engineer by cross-checking batch reports and weighbridge data, calculate volume from density, ensure the order matches, and prevent extra water.
Learn to estimate footing shuttering and concrete quantities for RCC works using perimeter or area methods, and plan batching, placement, and starter concrete on site.
Watch a live practical on footing reinforcement, showing footing mesh setup, binding wire securing, cover blocks for a 50 mm cover, and column reinforcement with rings and hooks.
Learn practical footing reinforcement: align column marks, place L-bars on the footing mesh, tie bars with master and intermediate rings, set shuttering, and pour with curing.
Assess a live apartment construction sequence from excavation to concreting, identify footing and reinforcement mistakes, and learn curing and IS code guidelines.
Observe a live practical video of a S+G+3 apartment construction, including towers A, B, and C, RCC framed structure, PCC, footings, retaining walls, STP, and amenities.
Explore good and bad construction practices on site, from proper working space, shuttering, and cover blocks to proper concrete placement, bleeding, segregation, curing, and quality control.
Learn to plan construction timelines, allocate resources, and forecast durations using productivity data, parallel activities, and planning sheets to become a site engineer.
Explore foundation classification, focusing on shallow footings—strip, isolated, pad, slope—and raft foundations, plus eccentric and combined footings and their design considerations.
Explore pile foundations and deep foundations, including drilled shafts/caissons, raft and hybrid systems, end bearing and skin friction, tremie concreting, and pile cutting.
Learn rough foundation through tying reinforcement, chair bars, and pile chipping, then construct the raft with shoring, diagonal strutting, and plan mass concrete pouring with boom placers and transit mixers.
Pile crushing on site demonstrates removing excess concrete to reach good concrete after addressing bentonite slurry, using a pile crushing machine, and prioritizing safety.
Learn to design footings from drawings by setting size and depth, use Excel for loads and soil bearing capacity, verify one-way and two-way shear, and specify 12 mm bars.
Understand column starter marking from footing to plinth, set starter frames, align shutters, apply 40 mm cover, and proceed with column concreting to beam bottom, curing, and backfilling.
Backfill in layers with consolidation and moisture control to prevent settlement; replace black cotton soil with good soil and verify 90–95% dry density via tests, guided by checklists.
Learn to estimate shuttering quantity and concrete volume for columns by size, height, and perimeter methods, and apply practical data for planning, scheduling, and cost estimation in site execution.
Compare columns and pedestals in construction, explain axial, uniaxial and biaxial loading, and show how pedestals prevent punching shear while saving concrete costs.
Explore pedestal and column reinforcement details, including pedestal construction, backfilling effects, proper lapping at the column center, and identifying common mistakes in practical reinforcement detailing.
Explore good and bad site practices in a column case study, including starter frames, cover blocks, 135-degree ties, lapping at the plinth center, proper vibration, and honeycombing prevention.
Explore lift, retaining, and basement walls integrated with footing, wall reinforcement, and columns, then learn sump and underground tanks, STP concepts, and the use of bituminous coating for waterproofing.
Explore practical site techniques from pedestal reinforcement and punching shear to backfilling, consolidation, lateral ties and triangular ring details, starter frame marking, shuttering, plumb-bob alignment, and vertical reinforcements.
Demonstrates practical execution from pedestal marking and starter concrete to column casting and backfilling, detailing wall reinforcement, bar lapping (50% staggered), curing, and bitumen coating for water protection.
Learn how to mark starter frames, align shuttering, and pour starter concrete using nylon thread, plumb bob, and center line marking, highlighting quality issues in local practices.
Learn to construct plinth beam PCC and complete beam casting, including 75-100 mm PCC thickness, beam width with 100 mm offsets, reinforcement, shuttering, curing, and anti-termite treatment.
Learn to read plinth beam layout and reinforcement drawings, compute shuttering and concrete quantities on site, and plan productivity for beam construction.
Learn how curing, bleeding, and improper cover cause cracks in plinth beams. The talk explains double bars for plinth and staircase connections and remedial drilling with chemical anchors.
Learn why plinth beams reduce the unsupported length of columns and carry masonry loads to the footing, transfer forces to the soil, and how tie beams further shorten column length.
Learn grade slab or slab on grade construction, backfilling and reinforcement options, and ramp design with rise, run, and slope calculations for basements and parking.
Learn on-site sequencing from plinth beam and PCC to backfill and the great slab, including PCC dimensions, compaction, reinforcement, shuttering, concreting, and concrete pump slump requirements.
Think through plinth beam layout by connecting columns, recognizing missing beams, and integrating architectural walls; verify reinforcement drawings and perform essential on-site checks for shuttering and concreting.
Deploy a raft foundation with variable depths and no backfilling, then establish starter frame, column concreting, beam bottom and slab, and reinforce for punching shear with a tower crane.
Learn how to prepare the ground floor reinforcement, fix the starter frame, and perform curing and de-shuttering within the substructure-to-superstructure framework, using elevation drawings and floor-to-floor measurements.
Set up beam bottom and shuttering for each beam using telescopic adjustable props or wooden props. Read first floor shattering layout to identify inside versus outside shuttering by slab direction.
Calculate beam bottom and determine outside and inside shuttering for exterior and interior beams, considering slab thickness and staircase areas to compute total centering and material needs.
Learn to fix beam bottoms, transfer one-meter marks on columns, calculate column height from floor-to-floor minus the maximum beam depth, and plan shuttering with props and plywood.
Learn to align slab centering with slab props and centering plates, using across pans, runners, and Acrow props within a staging system, including Doka H20 beams and ISMB-ISLB.
Explore Doka formwork and ISMB staging on site, detailing MB beams, cantilever extensions, prop placements, tie rods, and shuttering for columns with practical material and time considerations.
Identify and differentiate beam types on a construction site, including fixed, continuous fixed, cantilever, simply supported, hidden beams, lintel and primary vs secondary beams, with reinforcement layout.
Analyze structural drawings to identify top, bottom, and extra bars and stirrup layouts; apply bending moment and shear force concepts to design safe, economical beam reinforcement.
Master beam design with Etabs and manual calculation, balancing tension and compression reinforcement while selecting bar diameters, steel area, and stirrup details for singly and doubly reinforced beams.
Learn to read beam drawings and perform a beam bending schedule on site by calculating clear spans, development lengths, straight bars, stirrups, and steel weight for 230 by 450 beams.
Learn how to lower primary and secondary beams, identify beam roles, ensure development length, arrange reinforcement, plan shuttering, and implement cutouts and centering for slab construction.
Watch practical videos on beam reinforcement and slab centering across spans for a commercial project. Learn to plan cutting lengths, lower reinforcement, and verify with site engineers before concreting.
Learn practical beam lowering and complete slab centering in the site engineer masterclass, covering reinforcement layout, development lengths, stirrup spacing, and reading drawings to prevent common construction mistakes.
Identify good and bad construction practices on site and learn how to rectify mistakes. Master center-beam lapping and reinforcement anchorage concepts.
Explore one-way and two-way slabs, including their bending directions, main reinforcement placement, and the role of distribution steel, with how support conditions and dimensions determine slab type.
Explore one-way and two-way slabs, identify bending moments and reinforcement needs. Learn how main and distribution steel, crank bars, and monolithic casting influence sagging and hogging moments.
Explore five slab reinforcement types—alternate crank, both side crank, and three cut-reinforcement patterns—along with one-way and two-way slab behavior under bending moments.
Identify one-way and two-way slabs using yield line theory and learn to read slab drawings, including crank bar detailing for continuous and discontinuous supports.
Identify two way slab behavior and continuous and discontinuous supports, then apply crank and cut reinforcement concepts to read drawings and plan on-site slab reinforcement.
Shows practical slab reinforcement on site, detailing both-side crank bars, crank distributors, distribution bars, spacing and marking, binding, and 45-degree cranking.
Explore how to place crank bars and the crank distributor in a continuous slab, including top extra bars, and how negative and positive bending moments and shear are handled.
Watch how to install alternate crank bars on a two-way slab, placing longer-span bars first and cranking them to adjacent sections, then adding shorter-span bars with proper spacing.
Explore the alternate crank bar as main reinforcement for cantilever and continuous slabs, with polythene sheet preventing slurry loss and aiding de-shuttering, and a top extra bar for discontinuous supports.
Learn how to apply cut reinforcement for slabs without crank bars, place bottom steel on shorter and longer spans at 150 spacing, mark, bind, and lap correctly near supports.
Explore top reinforcement concepts in slabs, including cut reinforcement, top extra bars, chair bars, and the behavior of one-way versus two-way slabs.
Explore cut bar reinforcement with two-step curtailment in apartment slabs, optimizing steel by alternating full and curtailed bars under one-way and two-way slab designs.
Understand the sunken slab, cast 250–300 mm below the floor to hide plumbing and MEP lines in toilets and balconies. Coordinate with MEP before concreting and install sleeves for pipes.
Explore a practical sunken slab and MEP walkthrough, detailing two-layer reinforcement with bottom and top mesh, chair bars, sleeves in beams, and conduit layout before casting.
Master chair bars placement to support top and bottom mesh and resist negative bending moments; perform pre-slab checks on cover blocks, reinforcement drawings, slab type, and ready-mix planning.
Learn the do's and don'ts before slab concreting, covering centering, reinforcement laps, expansion joints with mastic pads, Chiapas, and practical site checks to ensure a safe, code-compliant slab.
Master slump test and cube test procedures before slab casting, including mass concrete temperature control, batching, mixing, placing, compacting, finishing, and curing.
Explore the types of concrete transportation, from pan and wheelbarrow to transit mixers, chutes, belt conveyors, and pump pipelines, with tips on proper placement and segregation avoidance.
Prevent slab failure by mastering staging, formwork, and cross bracing, then apply bonding and curing methods, including slump and flow tests for normal and self-compacting concrete.
Explore de-shuttering of slabs and beams, shuttering removal, slab centering, and props, along with curing compound usage and IS 456-2000 code guidelines for safe formwork removal.
Explore residential, commercial, and industrial construction through case studies of slabs, precast, post-tension systems, and façade detailing. See real-site examples of basements, high-rise frames, reinforcement checks, and safety nets.
Demonstrates marking five feet on columns to fix beam bottoms, transfer levels with a tube level, and set up slab centering and props for accurate formwork.
Watch a practical apartment construction video showing beam bottom fixing, slab centering, slab centering plates, acro span spacing, and props and shuttering quantity calculations to guide material needs.
Planning a 14,000 ft² slab casting, including pre-checks, reinforcement and prop setup, and nominal mix concreting with vibration for proper compaction.
Master on-site slab casting techniques, including double bar reinforcement for stairs, construction joints with nitro bond epoxy, level checks, and curing practices to ensure 150 mm thickness and uniform surface.
Explore 5000 sq ft slab concreting basics, including steel shuttering, water cooling of steel plates, vibrator use to prevent honeycombs, and quality water testing for durable concrete.
Calculate slab centering and concrete quantities, estimate shuttering plates, and apply rate-based book guidelines, then learn project planning sequencing for slab and beam works.
Explore practical first floor construction activities, from curing and bonding to tying column bars, lapping, and starter frame fixing, with step-by-step checks on alignment.
Learn to reinforce staircases on site, including double barreled reinforcement, middle landing beams, and cantilevers. Review plan and plinth beam layouts, riser and tread dimensions, distribution bars, and laps.
Observe site marking and placement of staircase reinforcement using plumb bob and 11-inch and 6-inch dimensions. Learn how rider and top/bottom reinforcements are installed and coordinated for slab casting.
Observe a live site demonstration of staircase reinforcement, showing beam reinforcement placement, top-to-bottom reinforcement swapping, marking, tube level checks, and grouting for a rigid stair structure.
Learn to mark riser and tread on staircase shuttering with a spirit level, ensuring six inch risers and eleven inch treads across landings and flights.
Explore placing staircase shuttering and reinforcement, including step marking, rise and tread dimensions, level checks, and mid-landing beam detailing for safe concrete construction.
Demonstrate staircase shuttering after all works, detailing the shuttering setup, reinforcement, and progression to the second floor within civil engineering construction methodology.
Learn on-site casting of a slab and staircase, including material preparation, mixing concrete, lifting with bucket and concrete lifter, placement, compaction, leveling, and shuttering considerations.
Explore brick and block masonry types—brick, solid block, hollow bricks, AC and CLC blocks, laterite stone and rubble—and learn bond patterns (stretcher, header, English, queen closure) with mortar guidelines.
Assess brick quality by checking bricks for sharp edges and color; soak bricks two hours, then test drops, sound, nail scratch, and water absorption to ensure 3.5 N/mm2 compressive strength.
Learn brickwork and block work layout from drawings using plumb lines, 3-4-5 checks, and 90-degree alignment, then verify doors, windows, and mortar gaps before the next layer.
Learn to perform brick work quality checks, including material tests (sieve analysis, silt, pH, organic matter), mortar ratios, curing, and basic brick manufacturing from clay to kiln.
Learn brickwork estimation and BOQ reading, including brick sizes, class designation, and mortar ratios. Calculate bricks, mortar, and water from cubic meter and square meter measurements for accurate takeoffs.
Explore IS 1077 standards for brickwork and mortar, including brick designations, dimensions, water absorption, and planning practical site procedures for brick and block work, racking, and jointing.
Compare AAC blocks and CLK blocks, noting their light weight, thermal insulation, faster construction, and reduced joints. Learn sizing, volume calculations, market rates, and block testing codes.
Explore good construction practices for blockwork, including proper mortar mixing with a measuring box, moisture pre-conditioning, staggered joints, curing, and RCC bands to ensure durable, watertight walls.
Explore sill band and lintel casting, including three feet height guidelines, bearing, extensions, and cut versus full lintels, plus in-situ and precast options.
Understand chajja sunshade cantilever design, reinforcement detailing for lintel and chajja, anchorage and counter load concepts, and proper prop removal to prevent overturning and cracks.
Chasing works create concealed electrical and plumbing pathways by cutting wall grooves. Install PVC or GI conduits, back boxes, and switchboards per drawings for neat plastering and proper module layout.
Explore steel lintel use in brickwork and plastering, brick reinforcement mesh and Arpita fiber mesh for crack-free plastering, plus chasing work, concrete banding, and MTC quality checks.
Fix fiber mesh, bull marks, and line drawings, using the 3-4-5 method to ensure 90-degree plumb. Apply internal 1:6 and external 1:4 plaster ratios; ceiling plastering first.
Master GI corner bead fixing to protect plaster edges and gypsum plastering for a smooth finish, with bonding, damp surface prep, curing, and QA/QC checks.
Fix door and window frames after brickwork and chasing, then plastering. Check plumb and level, protect doors during finishing, and compare uPVC and wooden frames and common door/window types.
Learn how to read plastering BOQ and estimate external, internal, and ceiling plastering using cement-sand ratios (1:4, 1:3, 1:6), thickness, and area, with practical quantity calculations and productivity notes.
Explore BOQ and estimation for doors and windows, covering rating per square meter for cornice and shattering work, wood and uPVC frames, fixing methods, hold fast, grills, and door types.
Explore common flooring options, natural stone, vitrified and ceramic tiles, wood, terrazzo, and paver blocks, and learn basic laying prep, moisture control, and finishing details.
Learn why a ledge wall is built in toilet areas to protect waterproofing and route polyvinyl chloride pipes through dummy walls, supporting wall-mounted fixtures, with plumbing checklists and leak testing.
This lecture explains the boq and execution details for flooring works—tiles, vitrified, granite, marble, and mosaic—covering thicknesses, bed mortars, skirting, epoxy grouting, and quality checks.
Explore painting methodology for construction sites, covering paint types such as oil bound distemper, emulsion, cement, bituminous, and antifungal exterior finishes. Understand putty prep, primer, protection, textures, and BOQ estimation.
Improve construction site safety and management by applying PPE, fall protection, scaffolding, barricading, housekeeping, safety meetings, inductions, medical checks, and incident prevention.
Apply ai-powered real-time safety monitoring to detect hazards, enforce helmet use, and trigger non-conformance reports, while drones, VR, and BIM enable data-driven site optimization.
Master formwork strategies in this lecture, from cup lock and ring lock systems to slab and beam centering, plywood shuttering, and aluminum formwork for faster high-rise builds.
Learn about building hardware types—door, furniture, safety and security—and apply space planning with furniture and access dimensions to inform interior design and rapid cost estimation.
Explore false ceiling options: pop, gypsum, metal, pvc, wooden, and mineral fiber acoustics. Identify wc types, washbasins, showers, and modern faucets for interior functionality.
Examine interior drawings for living rooms and bedrooms, including wallpaper, wall paneling, storage racks, television and sofa placements, kitchen layout with chimney, electrical planning, and precise dimensions for carpenter execution.
Learn interior drawing reading for wardrobes, tv cabinets, and tall units using Google SketchUp, with precise dimensions, drawers and compartments, glass sections, and wardrobe layouts for real-world execution.
Explore how DPR, WPR, and MPR capture daily, weekly, and monthly progress in construction, tracking labor, costs, and schedule to guide planning and project control.
Map the construction company organizational chart from chairman to site managers, including civil work, pipe rack, QA/QC, admin, and accounts, plus escalation paths toward senior project manager.
This is the most practical Building Construction Course designed for Civil Engineering students, Site Engineers, Diploma holders, and working professionals who want to learn real construction execution with AutoCAD drawings, site photos, and step-by-step explanation of every activity from footing to finishing.
Inside this course, you will learn exactly how buildings are constructed in real life—foundation, footing, columns, beams, slabs, shuttering, concreting, curing, masonry, plaster, flooring, waterproofing, and many more topics explained with clarity.
This course combines AutoCAD working drawings, BBS basics, QA/QC site checks, estimation fundamentals, and practical execution methods used by engineers on site.
What You Will Learn
Building construction process from start to finish
Types of foundations & footings with AutoCAD drawings
Column marking, layout, shuttering & reinforcement
Beam and slab construction with real site photos
Bar Bending Schedule basics for site engineers
RCC detailing, lap lengths, cover, anchorage, bends
Shuttering, formwork, centering & deshuttering rules
Concreting methods, compaction, curing techniques
Masonry, plastering, flooring & finishing activities
How to read AutoCAD construction drawings
Estimation basics used for BOQ & quantity takeoff
QA/QC checks for each stage of construction
Safety guidelines for site engineers
Practical civil engineering tips for real projects
Who This Course Is For
Civil engineering students
Diploma civil engineers
Freshers preparing for site jobs
Working professionals wanting practical knowledge
AutoCAD learners who want construction application
Anyone who wants to understand how buildings are constructed
Why This Course Is Different
Real site photos used in every module
AutoCAD working drawings for each element
Step-by-step explanation
Practical checklists you can use on site
Lifetime access + all updates free
100% beginner-friendly
You will learn exactly what is done on site and how to apply drawings in real execution.
Instructor: Akshay Kamath
Learn Step-by-Step Building Construction Process – From Excavation to Finishing with Real Site-Based Techniques
Master Construction Methodologies –From Excavation to Finishing for Real Site Execution l Learn How Buildings Are Built
B.E (Civil), MTech (Structural Engineering)
8+ Years of Industry & Teaching Experience
Trained Thousands of Civil Engineers
Expert in Site Execution, Structural Design & Construction Technology
Founder, Civil Brains Training Institute
Bonuses Included
Downloadable construction workflow PDFs
Site checklist templates
Project execution flowcharts
Interview prep for site engineer roles
Course Outcome
By the end of the course, you will be able to:
Work confidently at any construction site
Bridge the knowledge gap between academics and practical execution
Perform tasks expected of a full-time Site Engineer
Crack interviews with real-world knowledge
building construction
civil engineering course
construction course
autocad for civil engineers
construction drawings
site engineer training
building execution
construction site learning
practical civil engineering
autocad construction drawings
building execution course
Secondary Keywords:
footing construction
foundation types
column marking
shuttering and formwork
beam construction
slab reinforcement
bar bending schedule
concreting process
curing techniques
masonry and plaster
waterproofing basics
quantity estimation
QA QC civil engineering
civil site engineering